LD series bucket chain conveyor is orbiting the hopper to horizontal or inclined transportation of materials and equipment, widely used in power plants, mining, coal and other

industries a variety of loose materials transportation, such as boiler ash, cement clinker, slag , coke, gravel, etc., especially some warm

High capacity material, Flexible Roller Conveyor block degree, with a sharp sharp and highly abrasive materials. Since bucket chain conveyor with flexible layout, large transmission capacity, long life,

low maintenance, low operating costs, the advantages of large conveying angle by the majority of users.
Compared with similar devices, LD series bucket chain conveyor outstanding advantages are:
1 traction powered roller conveyor chain by using a professional manufacturers of high-strength chain double heavy plate chain, stable and reliable operation, long service life;
2 spiral tail with spring tensioning device allowing automatic traction chain tension adjustment, especially for long-distance and heavy load conveyors;
3. Process layout flexible, elevated, ground or pit arrangement can be horizontal or inclined l installation, but also increase the level of ramp installation;
4 bear drive, compact, easy to install.
Second, the layout of the form
1, chain bucket conveyor arrangement of Fig.
2, choose and determine the arrangement of conveyors should consider the following questions:
2.1 meet the technical requirements of the premise, should try to choose the simplest arrangement form;
2.2 single bucket chain conveyor length should not exceed 80m;
2.3 ramp-up time of transportation, ramp angle should not exceed 60 °.
Third, the technical parameters
Hopper width B has 350,450,630,800,1000 five specifications, according to the different operating situations and environmental requirements, chain bucket conveyor of open,

semi-closed and fully enclosed three.
Users can select the model parameters in the Schedule, and propose specific arrangement of form and dimensions, output, material parameters, and other requirements.
1, head 2, Group 3 power-driven sprockets, carrying components 4, 5 tilt the middle branch, on the rail 6, the next rail 7, 8 rear sprocket set, tailstock 9, screw tensioning

device

Comment on this post